Review

Wall and ceiling plastering

Job image

Job description

Interior plastering
Christchurch

Interior plastering required on walls and part of ceiling as fire place and hot water cupboard are being removed as you’ll see from attached photo. Plastering required to prep for painting. Flexible with timeframe as we will have a builder replace the gib on the walls and ceiling however in a couple of weeks (mid June) would be ideal!


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Couldn’t rate Jim any higher, the work was completed to an amazing standard and within a great timeframe! Communication was super speedy and we are super happy with the th Al result.

Work carried out by the owner/operator
Reviewed on 03-07-2023

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo