Published on 25 May 2023
Interior plastering required on walls and part of ceiling as fire place and hot water cupboard are being removed as you’ll see from attached photo. Plastering required to prep for painting. Flexible with timeframe as we will have a builder replace the gib on the walls and ceiling however in a couple of weeks (mid June) would be ideal!
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Couldn’t rate Jim any higher, the work was completed to an amazing standard and within a great timeframe! Communication was super speedy and we are super happy with the th Al result.
Work carried out by the owner/operator
Reviewed on 3 July 2023
Partner with Builderscrack
Get work