Published on 3 December 2024
I need about half my bathroom plastered and painted on top of new gib aqualine, prior to a new vanity and toilet being installed. Ideally would love the job done between 14-16 December if possible.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
An excellent job done by Ricardo, who came in over the weekend to fit with my bathroom renovation schedule. It looks stunning and I’ll be calling Ricardo for other jobs in the new year.
Work carried out by the owner/operator
Reviewed on 17 December 2024
Tradesperson reply
"Hi Alex,
Thank you and very much
Thanks and Cheers
Ricardo"
Partner with Builderscrack
Get work