Published: 23 September 2023
Have a new 8x3.5m office all gib is up except some Finishing areas -ceiling needs plastering and sanding -2x walls need plastering and sanding -1x wall needs another half sheet of gib Below photos are from a few days ago- have gibbed rest since then.
#1 | Tradie 1 |
|
12 jobs | No longer in contact |
#2 | Tradie 2 |
|
53 jobs | No longer in contact |
#3 | Tradie 3 |
|
21 jobs | No longer in contact |
#4 | Tradie 4 |
|
16 jobs | No longer in contact |
#5 | Tradie 5 |
|
0 jobs | No longer in contact |
#6 | Tradie 6 |
|
4 jobs | No longer in contact |
#7 | Tradie 7 |
|
6 jobs | No longer in contact |
#8 | Tradie 8 |
|
230 jobs | No longer in contact |
Partner with Builderscrack
Get work