Published: 6 July 2023
The damage was caused by the flood that happened 6 months ago. The hole has been repaired by a builder, and so now needs to be plastered. Flexible around timing of the work, but would prefer to have this done asap.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I am very happy with the quality of work.
Work carried out by the owner/operator
Reviewed on 31-10-2023
Partner with Builderscrack
Get work