Published: 20 August 2022
The walls at the bottom of the stairs area need plastering over new Gib work. It's the backwall and about 1/2 metre on the right wall. (See photo). I'm available anytime for access. Graham.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent work
Work carried out by the owner/operator
Reviewed on 12-10-2022
Partner with Builderscrack
Get work