Published: 1 July 2022
I have just completed some alterations to downstairs office/bedroom and the builder has finished doing the gib. The area now needs plastering over the joins and square stopped - about half a small room to walls and ceiling in total, plus a little bit more in the adjacent laundry where plumbing and electrical fittings have been relocated. See photos. No decoration is required.
#1 | Tradie 1 |
|
40 jobs | No longer in contact |
#2 | Tradie 2 |
|
122 jobs | No longer in contact |
#3 | Tradie 3 |
|
6 jobs | No longer in contact |
#4 | Tradie 4 |
|
132 jobs | No longer in contact |
#5 | Tradie 5 |
|
6 jobs | No longer in contact |
#6 | Tradie 6 |
|
53 jobs | No longer in contact |
Partner with Builderscrack
Get work