Active job

Bathroom Gib Stopping

Job description

Interior plastering
Auckland

Published: 12 June 2022

Bathroom renovation requires ceiling to be plastered - approx 8m2 room. Also Gibbing in hallway needs to be done approx 5m2. Needs to be done week of the 27th of June.


Trade professionals

#1 Tradie 1
132 jobs No longer in contact
#2 Tradie 2
53 jobs No longer in contact
#3 Tradie 3
74 jobs No longer in contact
#4 Tradie 4
35 jobs No longer in contact
#5 Tradie 5
8 jobs No longer in contact
#6 Tradie 6
69 jobs No longer in contact
#7 Tradie 7 Not reviewed 0 jobs No longer in contact
#8 Tradie 8 No recent reviews 39 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo