Published: 13 March 2021
We are building a new 15m by 7m barn structure next to our existing house. It is a steel structure being built by Totalspan. The wall height is 3.5m, and the peak ceiling height at the top of the roof pitch is about 5m above the concrete slab. After Totalspan complete the structure and all exterior cladding etc, we are fitting out the interior pretty much like a house living room with Gib lining the walls and ceiling. We need a plasterer to come in once the Gib is installed and do the plastering work prior to painting. Obviously lots of this work is at height. The work needs to be performed at the end of April / start of May. It is important that we get the timing of this right, so that other trades can follow. I can send plans - from which you can prepare a quote for the work if you are keen. Thanks, Phil
#1 | Tradie 1 | No recent reviews | 12 jobs | No longer in contact |
#2 | Tradie 2 |
|
125 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 55 jobs | No longer in contact |
#4 | Tradie 4 |
|
145 jobs | No longer in contact |
#5 | Tradie 5 |
|
33 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 12 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 5 jobs | No longer in contact |
#8 | Tradie 8 |
|
28 jobs | No longer in contact |
Partner with Builderscrack
Get work