Published: 10 November 2020
A new internal wall is being constructed to make a third bedroom. The wall is only 2.7 high by 3m long and obviously will need to be plastered on both sides. A little plastering will also be needed around the new internal door. See picture - the highlighted area is the new internal wall and door. This will be constructed the weekend of 28/29 November so anytime from the 30th would be suitable. The gib will be installed. This is simply a small, quick gib stopping job.
#1 | Tradie 1 |
|
15 jobs | No longer in contact |
#2 | Tradie 2 |
|
123 jobs | No longer in contact |
#3 | Tradie 3 |
|
74 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
132 jobs | No longer in contact |
#6 | Tradie 6 |
|
66 jobs | No longer in contact |
#7 | Tradie 7 |
|
172 jobs | No longer in contact |
#8 | Tradie 8 |
|
64 jobs | No longer in contact |
Partner with Builderscrack
Get work