Plaster beam 14m long and 0.35m deep, which has been ground back to concrete. It is about 3m high and mobile scaffolding is available on site. The work needs to be completed urgently. This beam is being used as a test and if successful, the rest of the building will be done.
Workmanship |
3.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
3.0
|
The work was interrupted by Covid-19. An extra coat was required to get a satisfactory finish.