Published: 24 November 2019
Master bedroom has been re-lined and requires stopping (level 4). 3 walls in total - see pics. Some small repairs required to plaster architrave also. First of 3-4 bedrooms to be re-lined so could result in future jobs if the right stopper is found.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Speedy service and great communication throughout.
Reviewed on 31-12-2019
Partner with Builderscrack
Get work