Published: 31 October 2019
Require plasterer for a kitchen renovation. Will include change to internal wall configuration and repair to existing walls. Extent of work required will not be known until cabinets are pulled out. Likely wall area likely affected is approximately 15m2. Work will need to be carried out in the week of 11 to 15 November ready for painting.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Does good work and did more than originally scoped within the quote. We will be using QPP again.
Work carried out by the owner/operator
Reviewed on 21-11-2019