Published: 31 March 2019
Downstairs bedroom - requires fyreline board and gibboard put up for one wall and partial touch up for ceiling. Downstairs bathroom, check of timber / metal framing to ensure still sound or repairs required. Have removed gibboard after a slow leak had occurred. Gibboard to be added for 1 - 2 walls / ceiling. Ideally want to get sorted within April / May.
#1 | Tradie 1 |
|
48 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
125 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 12 jobs | No longer in contact |
#5 | Tradie 5 |
|
103 jobs | No longer in contact |
Partner with Builderscrack
Get work