Published: 30 October 2012
I HAVE A PLASTER BOARD HOUSE BUILT ON A STEEP SITE.THERE IS CRACKING IN THE PLASTER.A STRUCTURAL ENGINEER HAS RECOMMENDED THAT THE FLOOR OF THE HOUSE BE LEVELLED + ADDITIONAL PILES INSTALLED.
#1 | Tradie 1 | No recent reviews | 3 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
36 jobs | No longer in contact |
Partner with Builderscrack
Get work