Published: 12 March 2012
Gibstopper required to gibstop both sides of 2 small new partitions (approx 4 m x 2.8 m high) to paint ready state. Plus fill small holes made by electrician in two flats to install new switches (20-30 min. job max) Plus repairs to base of gib wall in one bathroom. (toilet pan will be removed to make this easier) Gibstopping is most important job. Other repairs can be done by builder already on job if necessary. Or quote for all. Thanks
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Only reason I can't give correct rating for adherence to cost is that after arranging the plastering Endijs took on the painting of the flats as well. This is not quite finished so I have not paid the whole bill yet. I am very pleased with both the plastering and the painting, and would recommend his work to anyone. His decorating business deserves an "A" Plus.
Work carried out by an employee of the company
Reviewed on 02-04-2012
Tradesperson reply
"Thanks for the review, it was a pleasure to work for you.
Endijs"