Review

Comercial fit out

Job description

Interior plastering
Auckland

Published: 20 January 2017

I have 400 sq/m of Gib to be stopped in a commercial fit out in the area of Newmarket. This is a very good site to work in, a lot of long walls with few windows and difficult spots. This would suit a team of plasterers as there are timelines in the fitout. Start date is close to 7th of February. Experienced tradespeople with references are preferred.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Can't say enough about these guys, brilliant tradesmen to deal with. Professional in every way, and nothing was an issue. Would have back every time.

Work carried out by the owner/operator
Reviewed on 13-02-2017

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo