Published: 6 December 2016
We have had insulation fluff injected into our mid floor for sound insulation and need to get the ceiling holes Gib stopped and painted. There are 70 holes of 28mm diameter. Have already been rough stopped. We have paint available as the house is 3 years old. Photos attached.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job, easy to talk too, on time, no mucking around. Thanks Yianni!
Work carried out by the owner/operator
Reviewed on 10-01-2017
Partner with Builderscrack
Get work