Published: 2 December 2015
We have had two power points moved. The sparkie had to run the line behind the plaster board so there are about 5 small holes that need to be plastered and smoothed ready for painting.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 21-12-2015
Partner with Builderscrack
Get work