Active job

Adam Macdonald

Job description

Plasterboard Installation
Rodney

Published: 23 April 2018

I need new gyprock fixed to my ceiling. The roof has a pitch of about 25 degrees. It currently has exposed ceiling joists but needs more insulation. Total job requirements: -Ceiling batons run across existing rafters. -insulation installed above batons - gyprock fixed to batons. (Mandatory) - plastering / stopping Most importantly i need the gyprock fixed to the ceiling. (Please dont apply if can't do). I also have a stopper already if needed.) The job needs to be done during the week starting Monday 14th May


Trade professionals

#1 Tradie 1 No recent reviews 7 jobs No longer in contact
#2 Tradie 2 No recent reviews 74 jobs No longer in contact
#3 Tradie 3
74 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo