Published: 28 September 2017
New house needs GIB board installation and plaster = Level 4 Ceiling high 2.7m and 2.4m (13mm board) Total: 280 sqm Time: Start in 2 weeks MUST Sign off the paper work once job done for council inspection
#1 | Tradie 1 | No recent reviews | 33 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 41 jobs | No longer in contact |
#3 | Tradie 3 |
|
152 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work