Published: 25 May 2015
We're tracking down a leak in an excavated basement with breezeblock walls [completed 2009 - all expensively and professionally done], lined with plasterboard. To determine the extent of the leak, and work towards solving it, we need to remove 5 to 10 sq.m. (possibly more) of plasterboard on the stairwell down into the basement and see what's going on behind it. The job involves removing the plasterboard over any damp areas, leaving the rest tidy, cleaning up and getting the waste off site. Later, after the leak is resolved, we'll need to make good. Should be straightforward; I've removed a small area myself and it comes away easily.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
This was a potentially difficult job - and Mike and the team dealt with it effectively. Most particularly, Mike rapidly analysed the overall site situation, and gave recommendations regarding the root cause, appropriate solutions and work staging. Communications and timekeeping were excellent. MPV's rates are reasonable - not the cheapest - and exemplify getting what you pay for. Highly recommended.
Work carried out by the owner/operator
Reviewed on 28-07-2015
Tradesperson reply
"Thankyou Ross for your awesome feedback. Yes, we did get the required results. I guess that comes with experience. Been in the game long enough now, Mike"
Partner with Builderscrack
Get work