Published: 22 June 2023
A small bit of the ceiling has been removed. Now we need about 1.7 metres by 4.5 metres of gib or plaster board installed plastered and possibly painted. If possible at least plastered neatly by 28 June.
#1 | Tradie 1 |
|
125 jobs | No longer in contact |
#2 | Tradie 2 |
|
132 jobs | No longer in contact |
#3 | Tradie 3 |
|
35 jobs | No longer in contact |
#4 | Tradie 4 |
|
230 jobs | No longer in contact |
#5 | Tradie 5 |
|
9 jobs | No longer in contact |
#6 | Tradie 6 |
|
53 jobs | No longer in contact |
#7 | Tradie 7 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work