Published: 19 April 2023
2 bedroom walls water damaged during flood. Gib stripped off up to 600mm to enable drying. Walls now require repair IE gib, insulation, stopping and paint. One wall is timber framed with green Batts. The other is a block wall with battens and polystyrene insulation.
#1 | Tradie 1 |
|
16 jobs | No longer in contact |
#2 | Tradie 2 |
|
29 jobs | No longer in contact |
#3 | Tradie 3 |
|
31 jobs | No longer in contact |
#4 | Tradie 4 |
|
34 jobs | No longer in contact |
#5 | Tradie 5 |
|
0 jobs | No longer in contact |
#6 | Tradie 6 |
|
33 jobs | No longer in contact |
Partner with Builderscrack
Get work