Published: 15 April 2013
Bathroom 2.5M L x2M W x 2.45M H 1) CEILING Supply and fit Coves/trim. Fair and paint ceiling 2) GIB. Supply and fit Aqualine gib full wall on 2 and a half walls. Some wall levelling may be required. Stop and paint. 3) FLOOR Replace old particle board 1.0M x 2.0M with marine ply, some leveling required. Lay and seal 2M x 2M Saligna flooring tounge and groove 130mm W x 13mm thick on ply. I will supply the Saligna. 4) BATH Fix steel bath 1800 x 800 in place (build/rebuild cradle). Bath currently in position and plumbed, but all fittings accessible for temporary removal. Affix waterproof strip around edge of bath (supplied) Install shower liner (to be supplied), refit shower, taps. Install Shower door (supplied) NOTE: Painting could be done as a separate job, happy to accept quotes for just the bath frame/floor/gib/fittings etc.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.5
|
A small delay responding after I initiated contact, but I figure he's building, not sitting in front of a computer! A little delay in starting but they went the extra mile when factors outside their control delayed some parts of the installation. These guys work very fast and efficiently, make sure you have all your requirements and expectations well thought out and communicated in detail.
Work carried out by the owner/operator
Reviewed on 01-10-2013
Tradesperson reply
"Thanks."
Partner with Builderscrack
Get work