Active job

Fix problem that caused wet skirting and Gib board

Job image
Job image

Job description

Plasterboard Repair
Auckland

Published: 18 January 2018

Moisture meter shows high reading 28%-40% at two sections of the skirting and Gib board at the entrance hallway (2m long section) and at one side of the garage (3m long section). Suspect penetration of water through the bolts that secure the timber base plates to the concrete foundation. Removal and relocating the bolts and sealing the hole with epoxy may be required to fix this problem.


Trade professionals

#1 Tradie 1 No recent reviews 117 jobs No longer in contact
#2 Tradie 2 No recent reviews 2 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo