Kia ora, Will try to give as much detail as possible. We had to cut the concrete to dig up the drains. Soil has been well compacted below, (except for right at the end where it drops steeply onto the driveway, as shown in the picture) but now looking for someone to fill in these holes. The original concrete was probably overkill being 12cm thick with steel mesh underneath. No intention for cars to be on this section. 3 areas are: 70cm x 12cm 100cm x 80cm 500cm x 70cm Would be nice if the concrete could match as closely as possible what's already insitu. If you do driveways too we'd be interested in a quote, approx 50m long, gaining approx 10m elevation.