Published: 9 February 2024
The Exterior Panel and soffit's needs painting. The surfaces have been water blasted but some basic preparation is required prior to re painting. Please include Front and rear of garage, fence immediately outside garage, fence at rear of garage. Include lintels above windows, soffits and paneling inside porch. Handrails do not need to be included as they are being replaced in Aluminum. Sub floor access hatch be included.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by an employee of the company
Reviewed on 14-05-2024
Partner with Builderscrack
Get work