Published: 17 March 2023
One level unit flood damaged, gib replaced up to 600mm, some areas replaced to 2400mm, bathroom and toilet change colour (aquaenamel), 3 doors, 1 cavity slider, 2 x aluminum door jambs.
#1 | Tradie 1 |
|
17 jobs | No longer in contact |
#2 | Tradie 2 |
|
2 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
#4 | Tradie 4 |
|
16 jobs | No longer in contact |
#5 | Tradie 5 |
|
46 jobs | No longer in contact |
#6 | Tradie 6 |
|
155 jobs | No longer in contact |
#7 | Tradie 7 |
|
2 jobs | No longer in contact |
#8 | Tradie 8 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work