Published on 9 April 2021
We will have the area professionally cleaned before the work is carried out. The work that will need to be carried out is the preparation and painting of the exterior non-brick surfaces of the house. There are 7 large windows and a 3 areas of hardiboard and the soffit that require painting. Depending on price we may consider having the roof painted aswell.
#1 | Tradie 1 | No recent reviews | 27 jobs | No longer in contact |
#2 | Tradie 2 |
|
151 jobs | No longer in contact |
#3 | Tradie 3 |
|
131 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 2 jobs | No longer in contact |
#5 | Tradie 5 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work