Published: 8 December 2021
The house was built in 1999 and the wallpaper needs removed and walls/ceilings painted. Flexible timeframe.
#1 | Tradie 1 |
|
50 jobs | No longer in contact |
#2 | Tradie 2 |
|
56 jobs | No longer in contact |
#3 | Tradie 3 |
|
13 jobs | No longer in contact |
Partner with Builderscrack
Get work