Closed job

Painting Villa barge boards

Job image
Job image
Job image
Job image

Job description

Exterior Painting
Dunedin

Published: 20 April 2014

We are getting a new roof installed the 4 days starting 22nd April. A roof rail is currently around the house. We require a painter to paint the top barge boards and weather boards on the top peak. The woodwork is to be prepared (everything sanded and if required spot primed) with 2 top coats. The barge boards are a different colour to the weatherboards. We will supply the paint for the top coats but you will need to supply everything else. The work can be started anytime but the roofers probably wont want you around while they are putting on the roof, therefore you could probably start on Easter Monday but may then need to stay away until Sunday 27th. We can arrange for the scaffolding to stay up until Monday 4th May if required. Thanks very much for viewing our job :-)


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo