Published: 10 August 2020
We have some painting that needs to be completed at the front of our bungalow. We have wood shingles that need to be striped back and repainted. We also have barge board that needs to replaced and painted. We are flexible on when this could be completed however we would like this done by November at the latest. May require scaffolding to complete the job.
#1 | Tradie 1 |
|
25 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
#3 | Tradie 3 |
|
185 jobs | No longer in contact |
Partner with Builderscrack
Get work