Published: 14 October 2023
Need to reduce the level of soil against the house on the right by ~100mm to get below the foundation. Trench along foundation at 0.5% grade to the far to allow me to put a subsoil in below slab level. Form minor swale between houses so water flows towards direction of photographer and away from house. Max width of machine 1.2m as pinch point between neighbours AC unit and house. Would consider doing under dayworks.