Published: 4 June 2023
I need design and implementation of t retaining structures on a stream bank. One will be timber pole and one Galion and rock. You need to see the job and Geotechnical detail. You must be able to do the engineering design for council approval. They are ready to fast track approvals for flood damage and are keen to see a design. Geotechnical report in place.
#1 | Tradie 1 |
|
71 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
#4 | Tradie 4 |
|
114 jobs | No longer in contact |
#5 | Tradie 5 |
|
80 jobs | No longer in contact |
#6 | Tradie 6 |
|
0 jobs | No longer in contact |
#7 | Tradie 7 |
|
6 jobs | No longer in contact |
Partner with Builderscrack
Get work