Published: 13 September 2022
- Digging shallow (400mm deep) holes x 30 - Move the dug earth to the corner of the site Happy to do it by fixed price or per hole rate to start with and switch to hourly for additional landscaping work at the same site if the hole digging works out. About 10 of them are on compacted gravel over clay, and 20 are on loose clay with the odd root - but it should be an easy job.
#1 | Tradie 1 |
|
26 jobs | No longer in contact |
#2 | Tradie 2 |
|
105 jobs | No longer in contact |
#3 | Tradie 3 |
|
52 jobs | No longer in contact |
#4 | Tradie 4 |
|
128 jobs | No longer in contact |
#5 | Tradie 5 |
|
16 jobs | No longer in contact |
#6 | Tradie 6 |
|
8 jobs | No longer in contact |
Partner with Builderscrack
Get work