Published: 29 December 2014
Need to build a retaining wall so a fibreglass pool can go in, the wall will need to be approx. 1.8m above the ground (so quite deep down below) and then a deck put around the pool once it goes in. the land slopes down where the deep end of the pool will be I have been told the wall is approx. 4 days work for two people.
#1 | Tradie 1 | No recent reviews | 64 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 156 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 | No recent reviews | 17 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 23 jobs | No longer in contact |
Partner with Builderscrack
Get work