Published: 29 March 2022
Hi there, We'll need approx 4.5m3 of concrete pumped up an 15% slope approx 30M. Pump can be placed on the road for mixer to tip into. There will be 15 x holes to fill in total. Exact timings are to be confirmed.
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
Partner with Builderscrack
Get work