Published: 29 April 2021
We have had some retaining walls done and need to have scoria filled over the drain coil up to level and then top soil spread over a large section of ground that is mostly clay, so that we can then have either ready lawn, or hydro seeding applied. Looking for quotes ASAP
#1 | Tradie 1 |
|
115 jobs | No longer in contact |
#2 | Tradie 2 |
|
74 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 7 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 12 jobs | No longer in contact |
#5 | Tradie 5 |
|
25 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work