Published: 19 February 2014
Lift a concrete pad (digger required), level the surface, re-align external plumbing pipe, resurface with a footpath and stone chips, build small vegetable box, put in a gate. Remove all rubbish.
#1 | Tradie 1 | No recent reviews | 15 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 |
|
115 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work