Published: 31 March 2010
I need my back lawn area scrapped with a bob cat (small bulldozer). Just trying to get the area flatter than it is at the moment, before putting down top soil. The area is about 15mx6m, no soil needs to be removed as it will be scrapped to the lower level to build up. A small job, I don't expected that it would take more than a couple of hours if that. Open to a good cash price to get it done. Will also need top soil after this stage, so if you have the ability to deliver good clean top soil, about 4-5 cubic meters we consider you for this also.
#1 | Tradie 1 | No recent reviews | 4 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 24 jobs | No longer in contact |
Partner with Builderscrack
Get work