Published: 18 January 2013
Hello, We need someone to dig a trench where the electrical, water, and telephone cables will be burried for a new home. The length of the trench will be approximately 50-60 meters up a slope. The ground is soft (mostly top soil). There is no requirement to backfill the ditch. The job must be complete within 30 days of the start date. Regards, M
#1 | Tradie 1 | No recent reviews | 0 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 15 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 9 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 7 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 23 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 2 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work