Published: 28 October 2012
Removal of 96sqm of asphalt at a depth of 200mm, and 12.2sqm of garden (soil and mulch with two small tree stumps) at a depth of around 350mm to same overall depth of asphalt area. Also bringing in 6 cubic metres of gap 40 from local supplier or your supplier if cheaper.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
Great to work with, easy going, very careful around obstacles.
Work carried out by the owner/operator
Reviewed on 14-11-2012
Tradesperson reply
"Pleasure to work with. Thank you for the business!"
Partner with Builderscrack
Get work