Published: 21 September 2012
Firstly, I have a 100 square metre lawn that is not very level. I'd like it levelled, requiring up to 15cm skimmed off the top. Also I'm building a retaining wall and would like around 15 holes (poss 200mm diameter?) in depths from 500 to 900mm. Then there is about 2 - 3 cubic metres of soil to move around 10 metres to level another part of my section. Finally I have a metalled turn-around that has slumped and needs levelling - around 10 square metres up to 20cm deep. I hope that someone with a Bobcat or similar could do the whole lot pretty quickly?????
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 9 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 207 jobs | No longer in contact |
Partner with Builderscrack
Get work