Published on 20 November 2023
Excavate (by hand) approximately 1cu m, prepare base course on approximately 3 sqm, erect 500mm high retaining wall (Garden Wall Rockface 300 x 230 x 100) approximately 4m long, lay approx 2.6 sqm (270 x 270 x40 Iron Sand) flagstone paving. Back-fill retaining wall with scoria and replace excavated soil. Supply all materials, remove all rubble and leave site clean. Site visit necessary.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Pete and Ethan were terrific. The job was done to a high standard, their communication was excellent and they are really nice to have around. Highly recommend.
Work carried out by the owner/operator
Reviewed on 26 November 2023