Published: 5 March 2022
Builder has drilled holes for retaining wall for driveway extension and discovered substandard ground and things have caved in and we apparently need 7 x 500mm diameter plastic tubing and the poles (we have the poles) to be installed. To meet engineers/council requirements.
#1 | Tradie 1 |
|
1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 8 jobs | No longer in contact |
Partner with Builderscrack
Get work