Published: 29 October 2021
we need to tidy and extend the grassed area as much as possible (just over 1 metre) for a trampoline. We want to cut through the bank as far as possible to the upper pathway. Make the area retained with attractive bricks.
#1 | Tradie 1 |
|
15 jobs | No longer in contact |
Partner with Builderscrack
Get work