Published: 9 February 2020
The wall needs to be reinstated after a new water meter was installed. Some of the pavers underneath need to be reset Into concrete
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
High quality workmanship.
Work carried out by the owner/operator
Reviewed on 05-03-2020
Partner with Builderscrack
Get work