Active job

Level a water feature

Job image
Job image

Job description

Landscape Design
Napier

Published: 17 September 2010

Our water feature which is made of concrete and is therefore very heavy is no longer level. The 600mm concrete pad on which it was set several years ago has slumped into the soil below causing a list of about 50mm to one side. Consequently what should be a pool of water is continually running over one side. We require a strong man or two to correct it to level with packing underneath where necessary.


Trade professionals

#1 Tradie 1 Not reviewed 0 jobs No longer in contact
#2 Tradie 2 No recent reviews 6 jobs No longer in contact
#3 Tradie 3 Not reviewed 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo