Published: 29 May 2024
A low (150mm high?) deck was built to elevate a garden path where rainwater often dams up after a heavy downpour. This project includes the demolition and removal of the existing timber deck/walkway. (approx. 12m2) Prep substrate and lay new concrete pavers over weed-mat (approx. 15 - 20m2) Install a surface grate to prevent future flooding. (approx. 10m. no pit required?)
#1 | Tradie 1 |
|
36 jobs | Requesting contact |
#2 | Tradie 2 |
|
4 jobs | Requesting contact |
#3 | Tradie 3 |
|
12 jobs | Requesting contact |
#4 | Tradie 4 |
|
5 jobs | Requesting contact |
#5 | Tradie 5 |
|
0 jobs | Requesting contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | Requesting contact |
#7 | Tradie 7 |
|
1 job | Requesting contact |
#8 | Tradie 8 | Not reviewed | 1 job | Requesting contact |
Partner with Builderscrack
Get work