Published: 2 March 2021
Hi awesome builders. Look forward to seeing your work and past jobs done! I need some quotes based on per meter as above. site will be dug out close as possible to the fence line and ready for starting work right away. photos attached are showing where the line indicating earth will be cut out with (depth to base of house 1200mm from front of house sloping to back depth of 700mm at rear of house masonry) It eventually reaches level ground at the corner where I expect it would end Photo showing rough measurements. Please quote your price including materials and and timber used (rough sawn or dressed/planed). Have included examples of retaining wall we are after.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 12 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 15 jobs | No longer in contact |
#4 | Tradie 4 |
|
0 jobs | No longer in contact |
#5 | Tradie 5 |
|
21 jobs | No longer in contact |
#6 | Tradie 6 |
|
105 jobs | No longer in contact |
Partner with Builderscrack
Get work